DeskProcess OS
Overlay · not the system of recordHolds sit above scoreAsk Desk is deterministic — no modelLocal

Process / reliability engineer

Distillation column approaching flood

T-410 · C3 splitter

Lane · Standard

PriorityP1
Severityhigh
PacketReady
Suggested—

Why this is here

Differential pressure up 38% in 6 hours. Reflux was raised after a composition giveaway. Flood line is close.

  • PIDP 38% above baseline, 6h
  • LabC3 in bottoms still high
  • BoardOperator note: tap suspect
Recommended. Intervene: cut reflux 8%, hold feed. Do not wait for the high-DP trip.
DP tap may be partially plugged. Board operator thinks so. Lab composition disagrees — lab is late.

Current: Open

Overlay only. Will POST a label to the write-back URL, never a funds release. MES / PI / TrackWise event_disposition=WATCH on eng-flooding. Desk is not the system of record.