Process / reliability engineer

Heat exchanger fouling trend

E-330 · duty down 11%

Lane · Standard

PriorityP3
Severitylow
PacketReady
Suggested—

Why this is here

UA trending down 11% over 19 days. Turnaround is in 7 weeks. If we wait, the constraint moves to this exchanger.

  • PIDuty −11% vs baseline
  • PlanTA in 7 weeks
  • EnergySteam up 6% to compensate
Recommended. Watch this week, schedule a clean in the next opportunity window. Don't emergency-open.
Process side vs utility side is not isolated. One more test with inlet temps will tell.

Current: Open

Overlay only. Will POST a label to the write-back URL, never a funds release. MES / PI / TrackWise event_disposition=WATCH on eng-fouling. Desk is not the system of record.