DeskProcess OS
Overlay · not the system of recordHolds sit above scoreAsk Desk is deterministic — no modelLocal

Process / reliability engineer

SPC shift on impurity

LIMS · spec impurity B

Lane · Standard

PriorityP3
Severitymoderate
PacketReady
Suggested—

Why this is here

Eight points on the same side of the mean. Still in spec. This is the Western Electric alarm, not a batch fail.

  • LIMS8 consecutive points above mean
  • SpecStill 62% of limit
  • MethodGC method v1.4 deployed yesterday
Recommended. Watch. Increase sample frequency. Do not scrap. Find the shift cause on the day shift.
Method change in LIMS yesterday. Could be analytical, not process.

Current: Open

Overlay only. Will POST a label to the write-back URL, never a funds release. MES / PI / TrackWise event_disposition=WATCH on eng-spc. Desk is not the system of record.